I-96 Freeway Flex Route (Kent Lake Road to I-275/696/M5 Interchange) Map is updated frequently.īetter Roads Ahead - Aug 29 Road Construction Details The reconstruction is still expected to be reopened in time for school buses.Ĭlick the image below for all the detours to get around road construction in Novi. Next week, we can expect curb and replacements and paving back the roadway. The contractor is currently working on excavating out the poor, clay soils and replacing with a more suitable aggregate base. **Update** - August 15Īll pavement has been removed in the closure area. Based on the contractors schedule, this reconstruction should be reopened in time for school buses. Ingress and egress to and from the Island Lake Subdivision will need to be from entrances off 10 Mile Road, Napier Road, or other entrances off Wixom Road. For purposes of safety and productivity, this area (see attached location map) will be CLOSED. On Monday, August 7, our contractor, Cadillac Asphalt will begin reconstructing the eastern 500-feet of Drakes Bay Drive (at Wixom Road). Special Road Construction Update - Drakes Bay Dr. Hopefully, this makes everyone’s Novi Road/Grand River travels much easier. Nearly twenty years in the making, the Ring Road is now complete! The last segment of the Ring Road, Bond Street (SW quadrant of Grand River and Novi Road), received the ‘green’ light from the Road Commission for Oakland County to fully activate the Grand River Avenue signals and open to traffic. 2023 Road Construction Ring Road Notice - September 7
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |